Published 1 minute read
The assembly of cell no. 2 to the project from Benic, Alba county, the assembly of grain transport and conditioning equipment can be started: elevators, conveyors, grain dryer, etc.
Benic, Alba county
The assembly of cell no. 2 to the project from Benic, Alba county, the assembly of grain transport and conditioning equipment can be started: elevators…
Published 1 minute read
The assembly of cell no. 2 to the project from Benic, Alba county, the assembly of grain transport and conditioning equipment can be started: elevators, conveyors, grain dryer, etc.
More work
Timișoara, Timiș county · Biomass and pellets
A steel pellet silo at Biotim Timișoara with explosion vent panels on the roof: why they are there and what matters when installing them.
Timișoara, Timiș county · 2,000 t · Biomass and pellets
We have started assembling the 2,000-tonne pellet silos, with Mulmix equipment, at the Biotim biomass plant in Timișoara. How a silo goes up, ring by ring.
Brăila · 36,000 t
We are nearing the final stage of installation for the 36,000-ton project in Brăila County, a large-scale agricultural facility that includes a complete…
Request a quote
Tell us where the site is, what has to be done and the dates you are working to. We look at what the project needs, work out the resources and come back quickly with a clear proposal.
At home and abroad
Crews available for work in Romania and internationally.
A quick answer
We assess the timing, the people and how the job will be organised.
One person to talk to
From the first enquiry through to the end of the job.